Phase 1 of Mumbai Coastal Road Project inaugurated

The 9.5km stretch will operate between 8am and 8pm on weekdays, with a speed limit of 80kph (60kph in tunnels). 

11 Mar 2024 | 3595 Views | By Rivan RS, Autocar India

The Mumbai Coastal Road Project (MCRP), also dubbed the Dharamveer Swarajya Rakshak Chhatrapati Sambhaji Maharaj Coastal Road, has been inaugurated today by Maharashtra Chief Minister Eknath Shinde. Phase 1, which is the south-bound arm of the coastal road from Worli to Marine Drive and stretches 9.5km – the total length ...

This is an Autocar Pro Plus article. Subscribe to continue reading.

Copyright © 2025 Autocar Professional. All Rights Reserved.